sources, preventing a significant amount of CO  from
                                                                                                                                                   2
                                                                                                               being released into the atmosphere. Since January 2020,
                                                                                                               construction managers have achieved net zero for Scope 1
                                                                                                               and 2 emissions. By preserving the existing structure and
                                                                                                               reusing primary structural elements, such as the concrete
                                                                                                               substructure, piles, and superstructure, 36,000 tonnes of
                                                                                                               embodied carbon has been saved through reduced concrete
                                                                                                               usage. Additionally, most of the façade and internal masonry
                                                                                                               were also preserved.

                                                                                                               Rebuilding an icon

                                                                                                               Creativity and determination were needed to transform the
                                                                                                               Power Station into an exciting new destination for all to enjoy.
                                                                                                               In choosing to retrofit the historic elements of the iconic
                                                                                                               Battersea Power Station, while preserving its architectural
                                                                                                               elements to meet modern sustainability standards, the
                                                                                                               team behind the project needed high-level engineering
                                   Photo source: batterseapwrstn                     Photo source: John Sturrock  expertise and precision in planning. Adding to this challenge,
                                                                                                               the mere scale of the project in its entirety called for the
                                                                                                               synchronisation of an intricate network of stakeholders
       singing enthusiasts. The Power to Connect (PtC) programme   lighting system. The architectural design retains the original   and implementing sustainable infrastructure and systems –
       addresses digital connectivity challenges by collecting and   large windows adding skylights and light wells to harmonise   coordinating the installation of energy-efficient technologies,
       refurbishing devices for families in need, with over 2,500   with the existing heritage interior and harness natural light.   waste management systems, and sustainable transportation
       devices donated to over 80 schools in Wandsworth. In   By minimising the reliance on artificial lighting during   options.
       addition, the BPS Schools Programme provides educational   daylight hours, valuable energy resources are conserved. This
       workshops to primary schools, enlightening children about   commitment to sustainable practices demonstrates Battersea   Finally, the long-term time horizon of the project underlines
       the past, present, and future of the Power Station.  Power Station’s dedication to environmental responsibility.  the importance of future-oriented design and technology
                                                                                                               while putting in place continuous monitoring, adaptation, and
       Prioritising energy efficiency and thermal comfort   Low impact development                             future-proofing strategies to be at par with the ever-evolving
                                                                                                               sustainability standards and technologies.
       Battersea Power Station is constructed and managed   Cognisant of its role as stakeholders for the future
       according to the most rigorous design and performance   generation, the project team took to sustainable construction
       standards. To optimise energy efficiency, the mall incorporates   practices from the get-go. In 2018, Battersea Power Station
       LED lighting fixtures equipped with an occupancy control   decided to source all electricity from renewable energy