sources, preventing a significant amount of CO from
2
being released into the atmosphere. Since January 2020,
construction managers have achieved net zero for Scope 1
and 2 emissions. By preserving the existing structure and
reusing primary structural elements, such as the concrete
substructure, piles, and superstructure, 36,000 tonnes of
embodied carbon has been saved through reduced concrete
usage. Additionally, most of the façade and internal masonry
were also preserved.
Rebuilding an icon
Creativity and determination were needed to transform the
Power Station into an exciting new destination for all to enjoy.
In choosing to retrofit the historic elements of the iconic
Battersea Power Station, while preserving its architectural
elements to meet modern sustainability standards, the
team behind the project needed high-level engineering
Photo source: batterseapwrstn Photo source: John Sturrock expertise and precision in planning. Adding to this challenge,
the mere scale of the project in its entirety called for the
synchronisation of an intricate network of stakeholders
singing enthusiasts. The Power to Connect (PtC) programme lighting system. The architectural design retains the original and implementing sustainable infrastructure and systems –
addresses digital connectivity challenges by collecting and large windows adding skylights and light wells to harmonise coordinating the installation of energy-efficient technologies,
refurbishing devices for families in need, with over 2,500 with the existing heritage interior and harness natural light. waste management systems, and sustainable transportation
devices donated to over 80 schools in Wandsworth. In By minimising the reliance on artificial lighting during options.
addition, the BPS Schools Programme provides educational daylight hours, valuable energy resources are conserved. This
workshops to primary schools, enlightening children about commitment to sustainable practices demonstrates Battersea Finally, the long-term time horizon of the project underlines
the past, present, and future of the Power Station. Power Station’s dedication to environmental responsibility. the importance of future-oriented design and technology
while putting in place continuous monitoring, adaptation, and
Prioritising energy efficiency and thermal comfort Low impact development future-proofing strategies to be at par with the ever-evolving
sustainability standards and technologies.
Battersea Power Station is constructed and managed Cognisant of its role as stakeholders for the future
according to the most rigorous design and performance generation, the project team took to sustainable construction
standards. To optimise energy efficiency, the mall incorporates practices from the get-go. In 2018, Battersea Power Station
LED lighting fixtures equipped with an occupancy control decided to source all electricity from renewable energy
125 SUSTAINABLE REAL ESTATE | Our 10-Year Journey